Kingswood Lakeside

Customer:Morston Lakeside

Value: £2.3 million

VHE was awarded the contract to reclaim part of the former Poplars Opencast Colliery site in Cannock, West Midlands, over a 36 week programme.

The project involved 500,000m3 of earthworks to provide development platforms capable of withstanding on imposed bearing pressure of 80kn/m2, along with treatment of contaminated materials identified during a rigorous investigation of fill materials prior to excavation. The contract also involved the construction of over 1.5 km of on-site highway infrastructure and the provision of services for the proposed development.

Foul and surface water drainage was installed to a combination of adoptable and highways specifications, along with the creation of two new lakes to complement existing ones. Works included the erection of permanent deer fencing and the protection and maintenance of access to fishing facilities located within the works boundary.

The works were completed just ahead of the new M6 Birmingham Northern Relief Road Toll motorway, which runs adjacent to the site.

Investors in Diversity
Safe Contractor
UVDB Registered
Chas
ISO 45001
ISO 14001
ISO 9001
  • Head Office
  • 6 Newton Business Centre
  • Chapeltown
  • Sheffield
  • S35 2PH
  • Tel: 01226 320150
  • Scotland Office
  • Antonine House
  • 5 Carradale Crescent
  • Broadwood Business Park
  • Cumbernauld
  • Scotland
  • G68 9LE
  • Tel: 01236 457157
  • North West Office
  • Ensphere House
  • Warrington Road
  • Risley
  • Croft
  • Warrington
  • WA3 6BH
  • Tel: 01226 320150

Follow Us

© 2024 Copyright VHE Construction plc

Registered Office: 3175 Century Way, Thorpe Park, Leeds, LS15 8ZB.
Registered in England no. 1457182. VHE Construction plc is a wholly owned subsidiary of Renew Holdings plc.