Remediation of the heavily contaminated South Site and North Car Park at the former ICI dye works at Blackley, Manchester.

This highly sensitive project required the excavation, segregation and disposal of 140,000 tonnes of contaminated soils together with the installation of water treatment systems. The project was split into two distinct sections; the North Site and South Site.

Works to the northern car park consisted of the removal of Trichloroethylene (TCE) contaminated materials to prevent migration to the adjacent river. This involved the installation of sheet piling to protect the river, temporary coffer dams to facilitate excavation below river level, protection to existing services adjacent to the works and extensive pumping and treatment of contaminated waters followed by the reinstatement of the car park on completion.

Works to the south site involved segregation, processing and off-site disposal of contaminated materials arising from dye works production.

This was a highly sensitive project which was carried out in accordance with stringent health, safety and environmental controls.

Safe Contractor
UVDB Registered
Chas
ISO 45001
ISO 14001
ISO 9001
  • Head Office
  • 6 Newton Business Centre
  • Chapeltown
  • Sheffield
  • S35 2PH
  • Tel: 01226 320150
  • Scotland Office
  • Antonine House
  • 5 Carradale Crescent
  • Broadwood Business Park
  • Cumbernauld
  • Scotland
  • G68 9LE
  • Tel: 01236 457157
  • North West Office
  • Ensphere House
  • Warrington Road
  • Risley
  • Croft
  • Warrington
  • WA3 6BH
  • Tel: 07771 868765

Follow Us

© 2024 Copyright VHE Construction plc

Registered Office: 3175 Century Way, Thorpe Park, Leeds, LS15 8ZB.
Registered in England no. 1457182. VHE Construction plc is a wholly owned subsidiary of Renew Holdings plc.