…contract for the remediation of gardens and open spaces with asbestos contaminated soils, including reinstatement of patios and paths. The site consists of five properties located to the south of the village of Downton which is approximately nine…
…health and safety measures were required, including a type 3 asbestos survey (Demolition or Refurbishment Survey), to remove the asbestos sheeting before demolition of the existing buildings. On the project, extensive recycling of existing site…
…firstly required the removal of a significant amount of asbestos from the plant. A total of one hundred and first 30m³ skips of this material was disposed of in a licensed landfill site. Next, a number of structures were felled by means of…
…the production of tear gas and mustard gas, together with asbestos sheeting and lagging. Following the careful dismantling of the 5-storey structure, including a reinforced concrete chimney, all arisings were monitored prior to despatch into the…
…site was contaminated by radium226, mercury, beryllium and asbestos which was excavated and sentenced under controlled conditions. Due to the historical significance of Ditton Manor Park, the removal of contaminated silts by dredging of the moat…
…of parts of the site. The demolition included the removal of asbestos and the remediation included identification and disposal of contaminated materials. The segregation and treatment on site of Japanese Knotweed utilised areas not required for…
…clearance, the demolition of existing buildings including asbestos removal and the break out and recovery of concrete foundations and hardstandings for recycling into construction materials. The scheme also included the remediation of two former…
…process of careful segregation this was reduced by 50%. Any asbestos containing materials were subsequently classified and treated or disposed of following a quantitative assessment. Thursday 29 April 2021 hull gas works 28…