Most contractors deploying articulated dump trucks over a period of time will have suffered the overturning of a skip during operations, often throughout the course of repetitive deposition work with competent and experienced operators.

Most contractors deploying articulated dump trucks over a period of time will have suffered the overturning of a skip during operations, often throughout the course of repetitive deposition work with competent and experienced operators.

The causes of the incidents are varied but include shifting loads, poor haul road maintenance, soft ground, driving too fast, reversing over obstructions etc., but in nearly all cases the operator could have prevented the event if they were aware that the skip was tilting at some point in the operation.

VHE pioneered trials using retro-fitted inclinometers in 2012 but were unable to get buy in from manufacturers due to their reluctance to specify safe angles of operation due to the potential influence of plant deployment, including variation in load type, distribution, quantity and working conditions.

Times have changed significantly now and there are, thankfully, numerous pre and retro fitted inclinometers offering audio and visual alarms to operators based on the chassis angle of the skip and set for both roll and pitch in both lowered and raised skip positions. VHE have recently successfully completed a holder infill project at the former Burnley gasholder site, where a standard ADT fitted with a modern inclinometer was compared against the performance of an ejector articulated dump truck, which does not require raising of the skip to deposit it’s load.

Ejector dump trucks have always been the plant of choice when dealing with low headroom challenges but are not readily considered for general contracting activities with the ejector body generally only being suitable for applications where the maximum rock/aggregate size is less than 150mm.

In the head to head challenge at Burnley, there was no difference in load haul operations, or actual tipping cycle, but the ejector truck was impressive in unloading while travelling, leaving an evenly thin spread layer, requiring less dozer effort in grading. Despite atrocious weather conditions in February and the movement of some 12,000m3 of fill, involving 800 load haul and tip cycles, there were no incidents or overturn near misses reported from either truck.

Industry records indicate that over half of the overturning incidents reported occur when the skip is either partially or fully elevated, adopting either an ejector body or standard ADT fitted with a modern inclinometer, indicating the status of the vehicle prior to initiating tipping, could eliminate at least half of these unexpected and hazardous incidents.

For information on our services and experience call VHE on 01226 320150 or use our quick enquiry form.

Safe Contractor
UVDB Registered
Chas
ISO 45001
ISO 14001
ISO 9001
  • Head Office
  • 6 Newton Business Centre
  • Chapeltown
  • Sheffield
  • S35 2PH
  • Tel: 01226 320150
  • Scotland Office
  • Antonine House
  • 5 Carradale Crescent
  • Broadwood Business Park
  • Cumbernauld
  • Scotland
  • G68 9LE
  • Tel: 01236 457157
  • North West Office
  • Ensphere House
  • Warrington Road
  • Risley
  • Croft
  • Warrington
  • WA3 6BH
  • Tel: 07771 868765

Follow Us

© 2024 Copyright VHE Construction plc

Registered Office: 3175 Century Way, Thorpe Park, Leeds, LS15 8ZB.
Registered in England no. 1457182. VHE Construction plc is a wholly owned subsidiary of Renew Holdings plc.