Rugeley Eastern Bypass

Customer:Staffordshire County Council

Value: £2.0 million

This contract, part of the reclamation of the 52-acre former Lea Hall Colliery, was to construct a new link road between the A51 and A513 trunk roads connecting the development plots and the adjacent power station to the existing road network.

The works consisted of the construction of a new 1km single carriageway with drainage and services. Two new roundabouts connect the road to the power station at the western end of the site, whilst the connection at the eastern end incorporates a canal crossing.

The work also involved:

  • A 6m deep rock cutting
  • A structure over a live B class road
  • New service installations and diversions
  • Re-engineering of 60,000m³ of colliery shales, sand and gravels to form engineered embankment.

The project was carried out as a partnering agreement with designers, Staffordshire Engineering Consultants, under the New Engineering form of Contract Option C.

Safe Contractor
UVDB Registered
Chas
ISO 45001
ISO 14001
ISO 9001
  • Head Office
  • 6 Newton Business Centre
  • Chapeltown
  • Sheffield
  • S35 2PH
  • Tel: 01226 320150
  • Scotland Office
  • Antonine House
  • 5 Carradale Crescent
  • Broadwood Business Park
  • Cumbernauld
  • Scotland
  • G68 9LE
  • Tel: 01236 457157
  • North West Office
  • Ensphere House
  • Warrington Road
  • Risley
  • Croft
  • Warrington
  • WA3 6BH
  • Tel: 07771 868765

Follow Us

© 2024 Copyright VHE Construction plc

Registered Office: 3175 Century Way, Thorpe Park, Leeds, LS15 8ZB.
Registered in England no. 1457182. VHE Construction plc is a wholly owned subsidiary of Renew Holdings plc.