Huddersfield Gas Works

Customer:National Grid

Value: £2.6million

The former Huddersfield Gas Manufacturing Works covered an area of 3.2ha and was decommissioned in 1972. VHE undertook its remediation as part of the framework agreement with National Grid Property.

The works were carried out over a rolling 42 week phased programme of enabling/demolition, site investigation, design and implementation of on-site bioremediation and disposal of segregated wastes. Site investigations had identified contamination to soils and groundwater by gas production by-products including poly-aromatic hydrocarbons (PAHs) ammonia, spent iron oxide, aliphatic and aromatic hydrocarbons, and toxic metals.

To maximise the reuse of existing site materials, a targeted phase of dewatering of perched water was undertaken commencing with the deepest areas of excavation within retaining underground structures. This exercise produced a volume of over 5,000m³ of hydrocarbon contaminated waters which were pumped into a bespoke tank farm with primary and secondary settlement of suspended solids being enhanced by the addition of floculants.

Safe Contractor
UVDB Registered
Chas
ISO 45001
ISO 14001
ISO 9001
  • Head Office
  • 6 Newton Business Centre
  • Chapeltown
  • Sheffield
  • S35 2PH
  • Tel: 01226 320150
  • Scotland Office
  • Antonine House
  • 5 Carradale Crescent
  • Broadwood Business Park
  • Cumbernauld
  • Scotland
  • G68 9LE
  • Tel: 01236 457157
  • North West Office
  • Ensphere House
  • Warrington Road
  • Risley
  • Croft
  • Warrington
  • WA3 6BH
  • Tel: 07771 868765

Follow Us

© 2024 Copyright VHE Construction plc

Registered Office: 3175 Century Way, Thorpe Park, Leeds, LS15 8ZB.
Registered in England no. 1457182. VHE Construction plc is a wholly owned subsidiary of Renew Holdings plc.